This project is located in Qandil area (Sharafona Village). The type of project is Design – Build and Operate (DBO). The purpose of this project is to collect water from the river of Qandil and treat, purify water through the chain of physical and chemical operations then pump it to entire Aqre district and its surrounding area.
AQRE WTP
PROJECT DESCRIPTION
The project is supplying electricity through 33 kVA from Aqre to the water treatment station for more than 40 km distance. The project also provides 19 villages’ at the vicinity of the project with potable water.
The project involves procurement and installation of all required types of pumps water purification instruments – electrical instruments and all related civil works.